The light is hanging from the ceiling, I can see a bare wire - but have been assured that it's the earth, and therefore "safe". I'm no electrician, but bare wire? Doesn't look or feel "safe" to me.
Aside from that, it's the end of week 1 (of 3), where are we?
In the kitchen: The wall is gone, the wiring, sockets and light are all where they should be - having been moved about, again. The walls are patched and skimmed and the plaster is slowly drying. The cooker and washing machine are connected and available for use - but only after I called to drag a plumber back to reconnect the washer this evening. To be fair, there's only been 1 day I was without the washer, the cooker has been reconnected every day, or left connected and they've worked round it. I shouldn't have had to call for a plumber, and I could have reconnected the washer myself, but they're meant to do that as part of their end of day checks and it clearly isn't being done.
In the bathroom: There's still no sink, the bath is open underneath. There's dust and mess all over everything and the new fan they've fitted seems to be permanently on and makes a low level hum all day and all night. It's annoying me now, must remember to ask how to turn the damned thing off! Would have been useful to know that on the day they fitted it, which was Wednesday.
It's only been a week but I'm not impressed with the organisation on this. Simple communication would solve a lot of the issues. I'm at the end of the program of works, all this should have been ironed out months ago.
The plastic floor protector stuff is still down and we're all walking dust and muck all over the rest of the house. And I broke the hoover - which isn't actually a hoover, but it's a vacuum cleaner and we all call them hoovers, don't we? Not really broke it, not properly.... one of the wheels on the sucky head part had broken so it doesn't move across the floor as well as it should. Right now it's no big deal, but I'll want to replace it once the work is finished. Cleaning up after it's all done could be fun.
I'm an Englishwoman, living in the South Wales Valleys. I blog about life, stuff that catches my eye, and the occasional soap boxy rant.
Showing posts with label plastering. Show all posts
Showing posts with label plastering. Show all posts
Friday, 22 November 2013
Thursday, 21 November 2013
Day 4: Some plastering.
Not all of the plastering, and not what I expected. But some plastering.
They turned up at 8.15, and were long gone when I got back at 3.00.
They were working and getting on with things when I popped back in at around 10.
When I was told I was having the kitchen and bathroom done, I knew what level of work to expect - having been through it before. I think I've mentioned this before.
So... I expected the kitchen to be ripped out, and the bathroom - all units, appliances, fixtures and fittings. I expected dirt and dust and chaos. I expected them to rewire, to replace the pipes and gas supply. And I expected them to strip the walls back to brick and re-plaster.
No. They've patched and skimmed over the existing plaster. I really don't understand the reasoning there. Surely, with the amount of work being done, it would make sense to strip back and re-render and then skim? So, patches of the bathroom are still marked and rough. I'm hoping the areas they've left will correspond with the areas to be tiled.
Oh, and the ceiling. They've put up boards to level it and then plastered over most of it. Yes, most of it, because they didn't have enough boards on the van. Really? There have been people in and out of this house for days, with pre-work checks and measurements being done months ago. No-one measured the ceiling? No-one said to take extra boards?
And, again, no-one thought to tell me when they'd turn up today, or what was due to be worked on, and I have no idea what time to expect people tomorrow. I know the same blokes will be back to finish the ceiling and they think there's something else going on tomorrow.
Communication is sorely lacking and I'm not impressed with the lack of organisation.
More tomorrow...
They turned up at 8.15, and were long gone when I got back at 3.00.
They were working and getting on with things when I popped back in at around 10.
When I was told I was having the kitchen and bathroom done, I knew what level of work to expect - having been through it before. I think I've mentioned this before.
So... I expected the kitchen to be ripped out, and the bathroom - all units, appliances, fixtures and fittings. I expected dirt and dust and chaos. I expected them to rewire, to replace the pipes and gas supply. And I expected them to strip the walls back to brick and re-plaster.
No. They've patched and skimmed over the existing plaster. I really don't understand the reasoning there. Surely, with the amount of work being done, it would make sense to strip back and re-render and then skim? So, patches of the bathroom are still marked and rough. I'm hoping the areas they've left will correspond with the areas to be tiled.
Oh, and the ceiling. They've put up boards to level it and then plastered over most of it. Yes, most of it, because they didn't have enough boards on the van. Really? There have been people in and out of this house for days, with pre-work checks and measurements being done months ago. No-one measured the ceiling? No-one said to take extra boards?
And, again, no-one thought to tell me when they'd turn up today, or what was due to be worked on, and I have no idea what time to expect people tomorrow. I know the same blokes will be back to finish the ceiling and they think there's something else going on tomorrow.
Communication is sorely lacking and I'm not impressed with the lack of organisation.
More tomorrow...
Subscribe to: