Tuesday, 7 July 2015

Finally... The roof.

It feels like the scaffolding has been up forever. The car is out on the road and I can't easily cut the grass at the front, or work on the garden close to the house. There's plenty of other outdoor work to get done, when it's not raining, but we do live in Wales.... You know how it is though, as soon as something is denied to you, that's the thing you want to be doing.
At the end of last week they came to finish adding to the scaffolding so the entire house is now covered. On Sunday, I discovered the scaffolding is completely blocking the signal for the satellite dish. Luckily we don't watch much regular TV at all these days, and most of what we do watch is on a season break, not back on air until Autumn.
I phoned the housing association to let them know and was told that, "it does sometimes happen, I hope they haven't knocked the dish while putting the scaffolding up." I told them this was exactly why I was phoning. I don't expect an instant fix but I'd like it logged in case action needs to be taken once the scaffolding comes down, but in the meantime we can't watch the TV and could they give me a rough timescale for the roof work to be completed.
Thanks, we'll log that for you, and No.
Fantastic.
That was yesterday, which turned out to be a good day.
This morning, they came and started work.
There are broken tiles in the skip, piles of shattered wood and roof membrane on the front lawn, and pallets of new tiles. Pallets I get to keep! There are 5 on my lawn, and more being delivered next door. I wonder if I can have those too? I'm going to pop out and ask if I can scavenge the roof membrane for weed suppression in the back garden, but I'll wait until they finish throwing things off the roof!
They way they're cracking on with things they should be done by the end of the week.
In other news, the slugs ate my pumpkins, and I haven't seen the hedgehog since the plastic incident. I hope it's OK.

Friday, 29 November 2013

Day 10: Shower and paint.

The painters were here nice and early, around 8.30, but they weren't stopping just picking up a key. That meant I could go off out for the day.
A long hike up and over the mountain and then back through the village with a friend and her dog and my legs feel like they're going to drop off! I needed to get out and get the fresh air and exercise though.Then this afternoon it was the school Christmas fayre. Nothing spectacular but I'd be told off by my youngest if I didn't go, we I went and bought some stuff, had a cuppa and then I could take her home early.
In the bathroom, there's paint on the walls, the light is fixed and the shower unit is in but not plumbed in and not to be used yet.
It's looking good though, and will look better once I get the grout cleaned off the tiles.
Still to be done in the bathroom: Flooring, another coat of wall paint, gloss on the woodwork; bath side to be put on; window sill replaced and everything sealed where needed.
I need to remember to ask whether there's any sort of splashback being fitted round the sink.
Then I can start thinking about where the mirror, cupboard and other bits are going to go in there.
The kitchen is getting there too. The tiles are finally looking clean and there's less grout dust everywhere. Today was the second coat of paint so there's not much to see. But, we moved a large cupboard out of the way, realising there was nowhere for it to go in the new layout, and the space it's made really makes a difference.
Still to do in the kitchen: Snagging on the cupboards and drawers - uneven and out of alignment; flooring to go down; door frame trim to be replaced; woodwork gloss; fix the fan housing (loose and not flush to the wall); window sill to be fitted; plinths under the units to be fixed (after the floor is done).
Now we have a weekend off and then it's into the final week and it looks like they might be finished early. 

Tuesday, 19 November 2013

Day 2: A bit of pipe work.

The last kitchen I had ripped out and replaced took 9 days. They started on the Monday and finished around midday on the Thursday of the following week. The bathroom in that house took 4 days. The vans were sat outside my house ready to start work at 8.30 and they didn't quit until around 5. All the trades required on any given day would all show up together, argue over which radio station to listen to, make an unholy mess and then clean up at the end of the day.
The kitchen was bigger than this one. The job got done in minimum time, fairly efficiently.
So, this time round the kitchen and bathroom are being done at the same time, and it's going to take 3 weeks.
Why?
The work is slightly different. There's some structural stuff to do - a wall needed to come out. That was done yesterday. They arrived at 9.30 and were long gone when I got home at 3.00. Today was some plumbing work and no-one was here when I went out at 11.00. I passed the keys to a tenant liaison person and hoped the work might get done. When I got home at 3.00 there was soldering and stuff going on in my kitchen and he'd "got here about an hour ago." A simple communication would have sorted that. I should have known to not expect anyone this morning, and I should have known that yesterday at the latest.
He took another hour or so to put some pipes in, make a hole in the wall and take out the bathroom sink. The sink is in bits, sitting in the front garden.
Apparently the trades don't like working alongside each other, so a plumber can't be working while there are sparkies working, and the plasterers make a mess.
This would be why it's going to take 3 weeks then.
This is work being done towards the end of a program of ongoing improvements, and as such I would expect lessons to have been learned and timings to have been sharpened. It should be possible to have all this done in 2 weeks, maybe with an extra day for the structural stuff, or for last minute fixes at the end. Three weeks is excessive and a waste of resources.
Tomorrow I expect electricians to rewire the kitchen, which was rewired 2 weeks ago as part of the whole house rewire. Why they couldn't have incorporated that into the whole program I have no idea.
So, thinking abut it, it's not 3 weeks, it's more like 4.

Monday, 18 November 2013

Day 1: Demolition.

The van arrived, and I went out for the day. The shopping needed doing anyway, and once that was done I sought sanctuary at a friend's house.
All because today was demolition day.
The bathroom's not much different - the tiles are off the wall, the sides off the bath and the built in storage under the sink is gone - but it still looks like a bathroom.
It's not messy and the bath, although looking odd without the panels, is secure and steady and I'll be soaking in it later!
The kitchen, on the other hand......
More like, What kitchen?

The wall is gone, the door is gone and the radiator (attached to the wall) is gone. The cupboards, drawers, tiles, and a large slice of floor - all gone. The kitchen is now reduced to a building site with holes where the wall used to be and dust everywhere. The cooker and washing machine are still in place, and still connected so we can use them, and there is a temporary sink so washing up can happen.
It's actually not as bad as I'd feared, and although it feels a bit like camping, it's mostly functional, if not overly pleasant or practical.
Today's changes have been dramatic; the removal of a whole wall would have that effect. I imagine subsequent days may well be less big and obvious changes, although the overall process will be interesting to watch unfold and the end result will be great.
I wonder what tomorrow will bring?
See you in the morning. 

Wednesday, 13 November 2013

Here we go again

A few years ago, in the old house, we had the kitchen and bathroom ripped out and replaced. It was chaos, with dust, noise and mess for a couple of weeks. But the end result was great, a huge improvement on what was there before.
Then we moved.
Now we have to do it all again.
I've been looking for the before and after pics of that set of works, but I can't find them. They're not on my hard-drive, not on a memory stick and I can't find them on any of the CDs I have with data on either. They used to be on facebook, but I've obviously deleted the album there too. I took a couple of pics each day and the sequence would have shown what to expect.
Never mind.
The layout of this new house is better for this kin of work, with a separate sitting room we can move stuff into to keep it all out of the way. It'll be cramped for a couple of weeks but we'll cope and it's going to be great once it's finished.
I intend to take pics again, and I intend to blog it if I have power and internet through the work - there may be days where I don't.